The European Spallation Source (ESS) is the European common effort in designing and building a next generation large-scale user facility in Lund, Sweden, for studies of the structure and dynamics of materials. The proposed schematic layout of the ESS facility is based on a linear driver (Linac) directing the proton beam (5 MW of 2.5 GeV) of 2.8 ms long pulses with a 20 Hz on a tungsten target where neutrons are produced via spallation reactions. Further the neutrons will be moderated to thermal and subthermal energies in a couple of moderators placed around the target. The moderators feed 22 beamlines guiding the neutrons to the scattering instruments, mainly for neutron scattering research.
This work studies the radiological status of the shielding of the tune-up dump of the facility. This device will be placed in the lower room of the accelerator to target (A2T) section and will be used to tune the linac when the proton beam is not being sent to the target wheel.
The dump design and its associated planned irradiation history were taken from ESS Technical Design Report [1], but using copper as active zone of the dump. In the geometry model used in calculations the shielding around the dump was built as concentric cylindrical layers of iron and ordinary concrete.
As criterion for optimization limit of 1 µSv/h was used at the end of the shielding.
It was found that an optimum shielding configuration consists in 3 m of iron followed by 2 m of concrete. In order to derive the ground and water activation of the shielding foundations for selected optimum configuration an additional layer of five meters of soil was added to the geometry model.
Activation calculations were performed for various locations within the dump device, shielding and soil.
Calculations were performed using MCNPX2.6.0, Monte Carlo program [2] based on CEM3k nuclear reaction model coupled with CINDER'90 activation code [4]. For validation purpose the code FLUKA [3] was used as well.
The obtained results were used to characterized and classify the waste arising from the facility and to derive the source term needed for environmental impact analysis.
Through the comparison of the results obtained via the two methods used in the work it was found the difference within one order of magnitude.